From gas to green in London: Massive heat pump installation at Hillingdon leisure centre.

As part of Hillingdon Council's ambitious roadmap to achieve net zero by 2030, the Highgrove Sports & Leisure Centre—spanning over 4,000 m² across three storeys with a 33-metre pool, gym, spa, and fitness studios—has replaced its old gas boiler system with three Nova Series 440 kW heat pumps, delivering 1,320 kW at full duty from a remote installation.
Customer
Highgrove Sports & Leisure Centre
Installation date
2025
Industry
Sport & leisure facilities
Capacity demand
1,320 kW
Country
England
4,305m²
space heated
257 tonnes
annual CO₂ emission reduction
5,135 tonnes
lifetime CO₂ savings (tCO₂e)

Challenge

·        Support the municipality’s ambitious Strategic Climate Action Plan.

·        Heat pumps to be installed at a discrete distance from the centre.

·        Gas boiler technology providing heating and warm water.

Solution

·        3 x 440kW Nova Series modules replacing gas boiler technology.

·        Discrete and quiet outdoor installation some distance away from the centre.

·        Centrally controlled modules providing 1,320kW deliver yat full duty.

Result

·        Complete removal of fossil fuel heating technology from the building.

·        An expected annual CO₂ emissions reduction of 257 tonnes.

·        An estimated 5,135 tonnes of lifetime CO₂ savings over the entire operational lifespan.

"Thermonova heat pumps have been instrumental in helping us deliver substantial carbon reductions in our highest-energy-use buildings."

Glen Martin

Head of FM, Compliance and Planned Works